Beloved Morecambe hotel set for major makeover
Plans to carry out vital renovation work on Morecambe’s iconic Midland Hotel have been submitted to the city council.
The Inn Collection Group, who bought the hotel in 2022, have requested listed building consent for repair, redecoration and internal reconfiguration works to the Grade II* building.
This includes replacing render and some of the hotel windows as well as refurbishing parts of the hotel and improving the bar areas.
The historic mosaic floor in the reception area will also be “carefully overhauled” as part of the work.


A design statement by Adelphi Architecture on behalf of the Inn Collection Group says the proposals form a coordinated programme of repair, renewal, adaptation and upgrading intended to secure the long-term conservation and continued viable use of the Midland Hotel.
The scheme has been developed as a single, integrated conservation project rather than a series of unrelated interventions.
This approach provides the opportunity to undertake essential repairs, improve environmental performance and building resilience, rationalise later alterations and enhance the quality of the hotel accommodation and public areas, while avoiding repeated disruption to significant fabric.
"The overarching conservation approach has been to retain and repair significant historic fabric wherever this remains technically viable and capable of providing a durable solution,” the report says.


"Interventions have been designed to preserve the established architectural character of the building, remain proportionate to the significance of the spaces affected and, where possible, remove or reduce the impact of later unsympathetic alterations.”
The plans follow surveys which highlights issues including “widespread cracking, hollow areas, loss of adhesion, moisture-related staining and localised areas of detachment across multiple elevations” of the external render, along with “existing steel windows have now been exposed to almost two decades of exceptionally harsh marine conditions.
“The works have been informed by detailed condition investigations and seek to preserve the distinctive architectural character of the Midland Hotel whilst addressing defects that have developed following prolonged exposure to the coastal environment,” it adds.
Internal reconfiguration would also be carried out to improve the operation and functionality of the hotel, formation of additional guest accommodation through sensitive alterations to existing internal layouts, refurbishment of public areas, including alterations to improve the usability of the lounge, bar and associated spaces, and associated repair, maintenance, upgrade of services and refurbishment works “necessary to preserve the long-term condition of the listed building”.


“New finishes and materials have been carefully considered to complement the building's Art Deco character whilst providing a high quality environment appropriate for a contemporary hotel,” the report says.
“Works are proposed to the Rotunda (Bar) and adjoining bar areas to enhance their functionality and improve the overall visitor experience.
"The proposals seek to retain the architectural importance of these principal public spaces whilst introducing carefully considered interventions that support the hotel's ongoing operation.
“The proposals have been developed following detailed assessment of the building's significance and condition, with the overarching aim of retaining historic fabric wherever possible, preserving the architectural character of the building, and ensuring that all interventions remain proportionate and sympathetic to its Grade II* listed status.”


A “comprehensive refurbishment” is also proposed for to the North Hall bar, including the repositioning of the bar against the rear wall.
The report says the building suffered from inadequate maintenance, water ingress, deterioration of the external envelope and the cumulative impact of unsympathetic alterations during the 1980s and 1990s.
“The building remains highly exposed to the effects of its coastal environment,” the report continues.
“Salt-laden air, wind-driven rain and strong sunlight place particular pressure on the external render, steel windows, roof and associated details.
“Maintenance and periodic renewal are therefore essential to the long-term conservation of the building.
“The proposals forming the current application represent the latest phase in the building’s continuing evolution.


“They seek to address areas of repair, improve the functionality of the hotel and respond to contemporary operational needs while retaining the elements that contribute most strongly to its architectural and historic significance."
Joanna Pullan, director of Adephi Architecture, said: “The proposals have been developed following extensive investigation, consultation and design development, supported by detailed specialist reports assessing the condition of the external render, steel windows and significant historic fabric.
“These works have been designed to faithfully replicate the building's established appearance, preserving its architectural character, proportions, detailing, materiality and contribution to the Morecambe Conservation Area.
“No extensions alterations are proposed that would materially alter the external appearance of the building.
“The proposals represent the culmination of an iterative design process informed by pre-application discussions with both Historic England and Lancaster City Council.
“Earlier design concepts have been refined in response to consultation comments, resulting in a conservation-led scheme that seeks to secure the long-term conservation and continued viable use of this nationally important Grade II* listed building.”
The plans will be discussed at a future city council planning committee meeting.